Planning a Kitchen Renovation: Where to Start

Before layouts and finishes, four questions decide what your kitchen project actually is. Answer these first.

By Mastaba Kitchen & Bathroom Remodeling Updated 22 September 2026 7 min read

Most people start a kitchen project by collecting images. That is enjoyable and it is the wrong starting point, because images describe finishes and the expensive decisions are structural and mechanical.

Four questions, answered honestly at the outset, will tell you within a fairly narrow band what your project costs and how long it takes. Everything after that is selection.

n/a
Typical range
Discovery: 1 to 2 weeks
Typical timeline
Depends
Permit needed

The four questions

Does the layout actually frustrate you, or does the kitchen simply look dated? This is the single biggest cost fork. A dated kitchen with a workable plan is a renovation. A kitchen whose plan does not work is a remodel, and the difference is frequently thirty thousand dollars.

Do walls need to move, and are they load-bearing? Removing a load-bearing wall means a sized beam and a load path to the foundation. It is entirely routine and it is a significant line item that has to be known early.

Does the sink or range need to relocate? Moving the sink means drain and vent work. Moving a gas range means a gas line. Both are manageable, both are money, and both are far cheaper to decide now than to change later.

Can the electrical service carry a modern kitchen? Several dedicated circuits are required. In older housing the answer is often no without a panel upgrade, and that is a budget line rather than a surprise if it is checked early.

What moves the price

  • Layout change versus finish change. The single largest determinant of cost, ahead of any material choice.
  • Load-bearing wall removal. Typically $4,000 to $12,000 with engineering.
  • Plumbing and gas relocation. Straightforward over a basement, more involved on a slab.
  • Panel capacity. An upgrade adds $2,500 to $5,000 and is frequently needed in older homes.

Mistakes we see most often

  • Selecting finishes before answering whether walls move. The finishes are the last decision, not the first.
  • Assuming a wall is not load-bearing because it does not look like it is. In many houses the bearing wall runs the length of the plan and is unremarkable to look at.
  • Budgeting for the kitchen and not for the panel upgrade the kitchen requires.
  • Designing an island in a room that cannot take one.

What this means in the Capital Region

In Capital Region housing there is a reliable pattern. Houses built after about 1970 usually have a workable kitchen plan and dated finishes, which makes them renovation candidates. Houses built before about 1940 usually have a kitchen tucked into a back service area with a plan that reflects how households worked a century ago, which makes them remodel candidates.

Knowing which of those you have on the first visit tells you most of what you need to know about the budget, and it is why we would rather walk the room than quote from photographs.

Want this priced for your own home? Jeffrey Mason will walk the project and give you a free written estimate. No obligation, no sales rep. Call (518) 308-6427.

Frequently asked questions

What is the difference between a kitchen renovation and a remodel?

A renovation keeps the layout and replaces the finishes and fittings. A remodel changes the layout, which brings plumbing, electrical and often structural work into scope. The cost difference is typically two to three times.

How do I know if a wall is load-bearing?

It needs checking rather than guessing. Bearing walls often run perpendicular to the joists above and frequently sit over a beam or a foundation wall below. We check from the basement rather than from the kitchen.

Should I hire a designer?

For a layout change, it usually pays for itself. For a renovation that keeps the plan, our own design process is generally sufficient and is included.

Where do people most often go over budget?

Electrical service upgrades and structural work that was not identified before the project started. Both are avoidable with an hour of checking at the outset.

Related guides

Stop reading, start planning

Want this priced for your home?

Jeffrey Mason will walk your project and give you a free written estimate. No obligation, no sales rep.

Call (518) 308-6427
Call Now