Skip to content
800 NY 146 Suite 385, Clifton Park, NY 12065 Mon to Fri 8am to 6pm, Sat 9am to 2pm 5.0 from 50+ reviews
(518) 308-6427
← Back to Blog
Cost Guide

Full Bathroom Remodel Cost: What Does a Complete Gut Cost?

By Mastaba Kitchen & Bathroom Remodeling · April 25, 2025 · 10 min read

Bathroom completely gutted ready for renovation

A full bathroom remodel is a complete transformation. Everything comes out, everything goes back in new. The walls are stripped to studs. Plumbing and electrical are rerouted. Floors are pulled up. It's a blank slate. This is the most thorough and impactful bathroom renovation you can do, addressing decades of wear, updating outdated systems, and building the bathroom you've always wanted.

Full gut remodels are also the most expensive type of bathroom project. Everything has a cost: demolition, plumbing, electrical, framing, tile, fixtures, permits, labor, oversight. But the result, a fully modern, functional, beautiful bathroom, is worth the investment. This guide breaks down the complete cost of a full bathroom remodel, explains what's included at each budget tier, and helps you understand where your money goes.

What Does "Full Bathroom Remodel" Mean?

A full bathroom remodel means complete demolition and reconstruction. This includes: removing all fixtures, flooring, wall materials, and plumbing rough-in; addressing any structural issues found; installing new rough plumbing and electrical; installing new tile flooring and shower/tub surround; installing new fixtures; painting; finishing all details. The bathroom is completely rebuilt from the studs out. This is distinct from a renovation (cosmetic updates) or a partial remodel (updating some elements while keeping the layout).

The 10 Major Cost Categories in a Full Bathroom Remodel

1. Demolition and Hauling, $1,500 to $3,500

Complete removal of all fixtures, flooring, wall materials, and plumbing rough-in. Includes debris hauling and site cleanup.

2. Plumbing Rough-In and Upgrades, $2,500 to $6,000

Running new water supply lines, drain/vent stacks, and upgrading from galvanized to modern PEX or copper. In older homes, this is significant due to code compliance needs.

3. Electrical Rough-In and Upgrades, $1,500 to $4,000

Running new circuits, installing GFCI outlets, upgrading from older panels, and creating circuits for heated floors or special fixtures.

4. Framing and Structural, $1,000 to $4,000

Repairing or rebuilding framing, creating soffits for plumbing, addressing discovered damage. If removing a wall for an open concept, add $3,000 to $8,000.

5. Waterproofing and Substrate, $1,000 to $2,500

Cement board, waterproof membranes, and proper substrate for tile installation. Critical for longevity.

6. Tile and Flooring, $2,000 to $6,000

Flooring tile, shower surround tile, and any accent tile. Material and labor included. Premium materials increase cost significantly.

7. Fixtures and Hardware, $2,000 to $6,000

Toilet, vanity, faucet, shower head, towel bars, mirrors, and hardware. Budget fixtures are less expensive; designer fixtures significantly more.

8. Bathing Fixtures (Tub and/or Shower), $2,000 to $8,000

A basic tub costs $300 to $800. A freestanding tub costs $1,500 to $5,000. A high-end shower enclosure costs $5,000 to $12,000.

9. Lighting and Ventilation, $1,200 to $3,000

Vanity lighting, ceiling lights, exhaust fans, and installation. Quality lighting transforms the space.

10. Paint, Trim, and Finishing, $800 to $2,000

Wall paint, trim work, caulking, and final touches. Finishing details complete the project.

Bathroom showing plumbing rough-in work during gut remodel

Rough-in phase showing plumbing work in a full bathroom remodel

Complete Your Bathroom Transformation

A full bathroom remodel is a major project that requires expert planning, quality trades, and attention to detail. Mastaba manages every phase from demolition through finishing. Get a free estimate today.

Call (518) 308-6427 →

Three Budget Scenarios for Full Bathroom Remodels

Budget Full Remodel, $15,000 to $25,000 (5x7 bathroom)

Economy fixtures, mid-quality tile, basic finishes. Keeps existing layout. Good for quick transformation on tight budget. Includes all necessary code compliance and quality workmanship, but fewer premium upgrades.

Mid-Range Full Remodel, $25,000 to $40,000 (5x10 to 10x10 bathroom)

Semi-custom fixtures, quality tile, attractive finishes. May include minor layout changes. Most popular choice. Delivers lasting quality and attractive results.

Premium Full Remodel, $40,000 to $75,000+ (10x12+ bathroom)

Designer fixtures, premium tile, spa-like finishes. May include layout reconfiguration. High-end result with luxury details. Best for forever-home investments.

Timeline for a Full Bathroom Remodel

A full bathroom remodel typically takes 6 to 14 weeks depending on size and complexity. Weeks 1 to 2: demolition and rough inspections. Weeks 2 to 5: plumbing, electrical, framing, waterproofing. Weeks 5 to 9: tile, fixtures, painting. Weeks 9 to 14: finishing and punch-out. Quality work takes time. Rushing leads to mistakes.

Frequently Asked Questions

How much does a full bathroom remodel cost?

A full gut bathroom remodel typically costs $15,000 to $50,000+ depending on size and scope. Small full remodels run $15,000 to $25,000, mid-range remodels cost $25,000 to $40,000, and luxury remodels exceed $40,000.

What does a full bathroom remodel include?

A full bathroom remodel includes complete demolition, new plumbing, electrical upgrades, structural work if needed, flooring, tile installation, new fixtures, painting, lighting, and all finishing work.

How long does a full bathroom remodel take?

A full bathroom remodel typically takes 6 to 12 weeks depending on size and complexity. Smaller bathrooms take 6 to 8 weeks. Larger bathrooms with complex layouts take 10 to 14 weeks.

Can I save money on a full bathroom remodel?

Yes, by choosing mid-range fixtures and materials instead of premium options, keeping the existing layout, and avoiding changes during construction. Don't cheap out on plumbing, electrical, or structural work.

Is a full bathroom remodel worth it?

Yes. A full bathroom remodel improves daily quality of life, increases home value (50 to 70% ROI), and addresses aging systems in older homes. It's one of the best home investments.

What is the most expensive part of a full bathroom remodel?

Tile and plumbing work typically account for 40 to 50% of full bathroom remodel costs. Custom tile, waterproofing, and plumbing infrastructure are labor-intensive and expensive.

Get In Touch

Request Your Free Estimate

(518) 308-6427 info@mastabarenovations.com
800 NY 146 Suite 385, Clifton Park, NY 12065

Your information is secure and never shared.

Stop reading, start planning

Want this priced for your home?

Jeffrey Mason will walk your project and give you a free written estimate. No obligation, no sales rep.

Call (518) 308-6427
Call Now